3 Phase 32A IEC C13 C19 0U pdu distribution unit
Features
- HEAVY DUTY METAL POWER STRIP: Made of rugged Aluminum shell that offers great impact resistant performance, high wear resistance heavy duty power cord protects circuits from fire, impact or rust, and prevents dents and scratches.
- 24 OUTLET PDU: Providing enough sockets for your data centre cabinet racks. Heavy duty power strip was connected with 3M 5G6mm power cord, high current, Max. 50Hz/250V/32Amp/24KW.
- Detachable mounting ears, reversible ears faces front or back in PDU. Mounting flanges at rear of the PDU, which provide possibility of versatile installation.
- OVERLOAD PROTECTOR: With overload protection, the reliable overload switch will trip off automatically to protect your devices when over-voltage, over-current, overload, high-temperature, short-circuiting.
- IEC Outlets with locking system: YOSUN reliable locking IEC C13/C19 outlets ensure strong and firm power connection in usage to avoid inserted plugs coming off.
details
1)Size: 1420*55*45mm
2)Color: black
3)Outlets: 14 * locking IEC60320 C13 + 10 * locking IEC60320 C19
4)Outlets Plastic Material:antiflaming PC module IEC
5)Housing material:1.5U Aluminium alloy
6)Feature:3P 32A circuit breaker
7)Amps: 32A /customized
8)voltage:250V
9)Plug: 32A IEC60309 Industrial plug /OEM
10)Cable spec: 5G6mm2, 3M / custom
Support
Optional Toolless Installation
Customized shell colors available
Ready For Material
Cutting Housing
Automatic cutting of copper strips
Laser Cutting
Automatic wire stripper
Riveted copper wire
Injection Moulding
COPPER BAR WELDING
The internal structure adopts the integrated copper bar connection, advanced spot welding technology, the transmission current is stable, there will be no short circuit and other situations
INSTALLATION AND INTERIOR DISPLAY
Built-in 270°insulation
An insulating layer is installed between the live parts and the metal housing to form 270.
All-round protection effectively blocks the contact between the electrical components and the aluminum alloy housing, improving the safety level
Install the incoming port
The internal copper bar is straight and not bent, and the copper wire distribution is clear and clear
PRODUCTION LINE ADD CONTROL BOARD
FINAL TEST
Each PDU can be delivered only after the current and voltage function tests are performed