2P 50A circuit breaker Basic c13 c19 pdu strip
Features
- Heavy Duty Metal Power Strip: Made of 1.5U Alu shell that offers great impact resistant performance, high wear resistance heavy duty power cord protects circuits from fire, impact or rust, and prevents dents and scratches.
- 8 Outlet Long Power Strip: Providing 50A heavy duty power strip was connected with 6ft 6AWG/3C power cord, equipped with 50A high current NEMA 6-50P plug.
- Wall Mount Design: Power Strip Wall Mountable, provide 4 screws, wall mount strips to be securely installed in various applications, industrial, workshops, enclosed garages, shop, offices and workbenches, etc.
- 2P 50A circuit breaker: With 2 pole 50A circuit breaker, the reliable Chint MCB will trip off automatically to protect your devices when over-voltage, over-current, overload, high-temperature, short-circuiting. Circuit breakers of ABB / Schneider / EATON or any other brand you want, custom service is always available.
- 8 IEC Outlets with locking system: YOSUN reliable locking IEC C13/C19 outlets ensure strong and firm power connection in usage to avoid inserted plugs coming off.
details
1)Size:19" 483*55*45mm
2)Color: black
3)Outlets: 6 * IEC locking C13 + 2 * IEC locking C19
4)Outlets Plastic Material:antiflaming PC module
5)Housing material: 1.5U Aluminium alloy
6)Feature:2P 50A circuit breaker
7)Amps: 50A /customized
8)voltage:250V
9)Plug: NEMA 6-50P / OEM
10)Cable spec: 6AWG/3C, 6FT / custom
Support
Optional Toolless Installation
Customized shell colors available
Ready For Material
Cutting Housing
Automatic cutting of copper strips
Laser Cutting
Automatic wire stripper
Riveted copper wire
Injection Moulding
COPPER BAR WELDING
The internal structure adopts the integrated copper bar connection, advanced spot welding technology, the transmission current is stable, there will be no short circuit and other situations
INSTALLATION AND INTERIOR DISPLAY
Built-in 270°insulation
An insulating layer is installed between the live parts and the metal housing to form 270.
All-round protection effectively blocks the contact between the electrical components and the aluminum alloy housing, improving the safety level
Install the incoming port
The internal copper bar is straight and not bent, and the copper wire distribution is clear and clear
PRODUCTION LINE ADD CONTROL BOARD
FINAL TEST
Each PDU can be delivered only after the current and voltage function tests are performed