L730R digital meter vertical rack pdu
About this item
Premium Performance Rated Voltage: AC 100–250V Input, L730 plug,wide use in US, 3 total outlets for your devices. Can be L and N Double-break Switch, smart EMI.RFI Protection, and Gen 3 10KA Surge Protection module,if you like those features contact us to realize!
High-end Appearance The L730R PDU use Hardened Aluminum Profile, UL94V-0 Grade Flame Resistant Material, 6 FT robust Power cord or OEM length.
High-precision Instruments The Power Distribution Unit built-in High-precision measuring instruments, Measurement Accuracy:Class-1, LED screen display current, voltage and power clearly
Easy to InstallThe Surge Protection Power Strip support 19 inches Rack 1U horizontal installation and 0U Vertical ,with 4pcs cassette nuts and crown screws, you can easily fix it
Heavy Duty Power Strip Can be 3phase and 63A /125A .Charging multiple devices for your wall/ table/ DJ console/ Computer desk/ Studio Room/ Home/ Office/ Club /Server Room/ Data Center/ Building/ Mining/ Network Cabinet
details
1)Size:925*62.3*45mm
2)Color: black
3)Outlets – Total :3
4)Outlets Plastic Material:antiflaming PC module UL94V-0
5)Housing material:Aluminium alloy
6)Feature:anti-trip, Meter ,cable box
7)current:3P 60A
8)voltage:277V/480V
9)Plug: US /OEM
10)Cable length 14AWG, 6ft / custom length
Series
logistics
Support
Optional Toolless Installation
Customized shell colors available
Ready For Material
Cutting Housing
Automatic cutting of copper strips
Laser Cutting
Automatic wire stripper
Riveted copper wire
Injection Moulding
COPPER BAR WELDING
The internal structure adopts the integrated copper bar connection, advanced spot welding technology, the transmission current is stable, there will be no short circuit and other situations
INSTALLATION AND INTERIOR DISPLAY
Built-in 270°insulation
An insulating layer is installed between the live parts and the metal housing to form 270.
All-round protection effectively blocks the contact between the electrical components and the aluminum alloy housing, improving the safety level
Install the incoming port
The internal copper bar is straight and not bent, and the copper wire distribution is clear and clear
HOT-SWAP V/A METER
FINAL TEST
Each PDU can be delivered only after the current and voltage function tests are performed