3phase 80A high power mining pdu outlet
Features
1.Deal solution for locations that require power to many devices, like plant workshops, mining farm, and so on.Package with 4 screws, you can mount it where you want to.
2.Mountable power strip is made from mental shell Housing and Flame-retardant PC, with mounting hole on both sides. It can protects circuits from fire, impact or rust, and prevents dents and scratches.
3.Switch Built-in 80 Amp Circuit Breaker Wall mount power distribution units with switch, built-in 80 amp circuit breaker, protect connected devices from high voltage, short circuits, overload, etc.
4.80A Connection terminal. Suitable for heavy duty power cords, or any other high power connection in need, allows you to connect to the power supply conveniently, Suitable for a variety of different environments.
5.High Quality: The design of the metal shell is sturdy and durable, and the workmanship is excellent, heavy duty outlets with UL Certification, comply with safety standards, you can use it with confidence.
details
1)Size: 893*180*45mm
2)Color: black
3)Outlets: 12 * IEC60320 C19
4)Outlets Plastic Material:antiflaming PC module C19
5)Housing material:black mental shell
6)Feature: 2P 80A circuit breaker, switched
7)Amps: 80A /customized
8)voltage:400V
9)Plug: IEC IP44 plug /OEM
10)Cable spec: custom
Support
Optional Toolless Installation
Customized shell colors available
Ready For Material
Cutting Housing
Automatic cutting of copper strips
Laser Cutting
Automatic wire stripper
Riveted copper wire
Injection Moulding
COPPER BAR WELDING
The internal structure adopts the integrated copper bar connection, advanced spot welding technology, the transmission current is stable, there will be no short circuit and other situations
INSTALLATION AND INTERIOR DISPLAY
Built-in 270°insulation
An insulating layer is installed between the live parts and the metal housing to form 270.
All-round protection effectively blocks the contact between the electrical components and the aluminum alloy housing, improving the safety level
Install the incoming port
The internal copper bar is straight and not bent, and the copper wire distribution is clear and clear
PRODUCTION LINE ADD CONTROL BOARD
FINAL TEST
Each PDU can be delivered only after the current and voltage function tests are performed