Single phase 1P 32A MCB pdu 8 IEC c13
Features
1.Safer for Use
1P circuit breaker
2.More Durable Standard power strips typically connect all of the outlets with long copper sheets.
Rack PDU from our competitors, regular plugging could result in poor contact, the copper itself is also of inferior quality.
Rack PDU from us, use pure copper modular sockets of the highest quality, which are industrial grade. If you plug it in for a while, it won't come loose. To connect all of the modular sockets, we use 6mm2 brass bar, which can handle a maximum of 32A of current and produces less heat.
Four installation options are supported by our industrial grade rack mount power strip: desktop, wall mount, 19" rack mount, and flush mounting. There are various installation techniques. It can better suit customer needs because it has a wide range of uses and is essentially not location-based.
details
1)Size:19" 483*44.8*45mm
2)Color: black
3)Outlets: 8*IEC60320 C13 with locking
4)Outlets Plastic Material:antiflaming PC module
5)Housing material:Aluminium alloy
6)Feature:1P 32A circuit breaker
7)Amps: 32A /customized
8)voltage:250V
9)Plug: 32A IEC60309 plug /OEM
10)Cable length: 3X6mm2, 2M / custom
Support
Optional Toolless Installation
Customized shell colors available
Ready For Material
Cutting Housing
Automatic cutting of copper strips
Laser Cutting
Automatic wire stripper
Riveted copper wire
Injection Moulding
COPPER BAR WELDING
The internal structure adopts the integrated copper bar connection, advanced spot welding technology, the transmission current is stable, there will be no short circuit and other situations
INSTALLATION AND INTERIOR DISPLAY
Built-in 270°insulation
An insulating layer is installed between the live parts and the metal housing to form 270.
All-round protection effectively blocks the contact between the electrical components and the aluminum alloy housing, improving the safety level
Install the incoming port
The internal copper bar is straight and not bent, and the copper wire distribution is clear and clear
PRODUCTION LINE ADD CONTROL BOARD
FINAL TEST
Each PDU can be delivered only after the current and voltage function tests are performed