3phase 125A 415V 24 C19 outlets IP switched pdu
Main Benefits
Yosun smart PDU YS1524-3P125-C19-GES Main Benefits:
A,Remote network management,
a. Cascade management (SNMP V1.V2.V3)
b. Data graphical display d. User management
c. The log saved
d. Multiple alarm mode
g. Access management, by http, TCP/IP(IPV4/V6), telnet,ssh or modbus-rtu
h. Multiple options
B Monitoring function
a. Monitoring input voltage b. Monitoring total load current
c. Monitoring total power (KW)
d. Monitoring energy consumption (KWH)
e. Motoring total power factor
f. Monitoring each outlet power
g. Calculate each unit energy consumption
C. Control function
a.On / off control for each outlet
b.On / off time setting for each outlet
c.Boot time delay setting d.Set current limit for each outlet
e.Overload protection (automatic power-off)
details
1)Size: 1880*130*90mm
2)Color: black
3)Material: metal shell
4)Outlets: 24 * IEC60320 C19 / custom
5)Outlets Plastic: Material:antiflaming PC
6)Function:network remote control management by individual outlets, 3P 125A Electromagnetic hydraulic circuit breaker,
7) Current: 125A or OEM
8) Voltage: 380V-480V
9)Plug: IEC60309 5P125A / OEM
10)Cable spec: custom
Support
Optional Toolless Installation
Customized shell colors available
Ready For Material
Cutting Housing
Automatic cutting of copper strips
Laser Cutting
Automatic wire stripper
Riveted copper wire
Injection Moulding
COPPER BAR WELDING
The internal structure adopts the integrated copper bar connection, advanced spot welding technology, the transmission current is stable, there will be no short circuit and other situations
INSTALLATION AND INTERIOR DISPLAY
Built-in 270°insulation
An insulating layer is installed between the live parts and the metal housing to form 270.
All-round protection effectively blocks the contact between the electrical components and the aluminum alloy housing, improving the safety level
Install the incoming port
The internal copper bar is straight and not bent, and the copper wire distribution is clear and clear
BATCH PDUS ARE COMPLETE
FINAL TEST
Each PDU can be delivered only after the current and voltage function tests are performed